2009

Anson, ME

Owner
Engineer

Corrugated composite panels with geo-grid mechanically stabilized earth

Town of Anson, Maine

Advanced Infrastructure Technologies

Brewer, Maine

Gardner Construction Enterprises, Inc.

Contractor
Span
Rise
Width
Skew
Headwall
About
Arches

Bangor, Maine

27'-7"

4'-5"

25'

15°

The town of Anson required that the bridge be completed prior to the beginning of the school year so busses could avoid lengthy rerouting. Even though the beginning of construction was delayed until mid-august the bridge was replaced start to finish in twelve working days and open to traffic by the first day of school.

9 Carbon Fiber Tubes, 3' spacing 12" diameter

McGee Bridge