2010

Hermon, Maine

Owner
Engineer

N/A

Penobscot Snowmobile Club

Advanced Infrastructure Technologies

Brewer, ME

Gardner Construction Enterprises

Contractor
Span
Rise
Width
Skew
Headwall
About
Arches

Bangor, ME

44'-6"

6'-10"

12'

When a car drove off the road and struck a nearby snowmobile bridge in Hermon the Penobscot Snowmobile Club chose to replace the former wooden structure with a composite arch bridge. Designed for snowmobile groomer and snow loads this solution proved an economical and durable option for the snowmobile club.  The bridge was constructed in four working days.  The deck is an 8" roughened reinforced concrete slab.

3 Carbon Fiber Tubes, 5'-6" spacing, 12" diameter

Tom Frost Bridge