Previous Bridge
Next Bridge


2013
Sunfield, Michigan
Owner
Engineer
Integrated Cantilevered Precast Concrete Wall Anchored into the Deck
MichiganDOT
Michigan DOT
425 W. Ottawa St. Lansing, MI 48909
Davis Construction Co.
Contractor
Span
Rise
Width
Skew
Headwall
About
Arches
Lansing MI,
37'-8.5"
8'-8.375"
48'-4.5"
25º
Headwall is integrated into deck and provides fascia over the outside arches Second constructed bridge in Michigan Project is located on State Route M50 about half way between Lansing and Grand Rapids
24 Glass Fiber Tubes, 2'-0" Spacing, 12" Diameter