2015

Eaton County, Michigan

Owner
Engineer

Precast Concrete Tie-Through

Michigan DOT

Michigan DOT

Lansing, MI

Davis Construction Corp.

Contractor
Span
Rise
Width
Skew
Headwall
About
Arches

Lansing, MI

32'

11'

47'-6.5"

The M-100 Bridge was a 2 phase project, which allows contractors to maintain traffic through the duration of the project. AIT's third bridge in Michigan located in Potterville, just south west of Lansing, MI. Featured AIT's custom pultruded decking and stage allowed AIT to develop a longitudinal lap splice.

12 Glass Fiber Tubes, 4'-2.5" Spacing, 15" Diameter

M-100 Over Thornapple Drain