Article: ConstructionEquipmentGuide.com

AIT Bridges was recently featured in an article on constructionequipmentguide.com covering the construction of the Loutsis Creek Bridge on S.R. 203, in Duvall, WA. Senior Operations Engineer, Wendell Harriman, P.E., who was on site for the construction of the bridge, was interviewed for this article. Read below to find out about the equipment used on site, how the arches were transported and how many cubic yard of soil had to be transported from the site.



Article: https://www.constructionequipmentguide.com/composite-bridge-system-used-for-first-time-on-west-coast/50134