Article: ConstructionEquipmentGuide.com

AIT Bridges was recently featured in an article on constructionequipmentguide.com covering the construction of the Loutsis Creek Bridge on S.R. 203, in Duvall, WA. Senior Operations Engineer, Wendell Harriman, P.E., who was on site for the construction of the bridge, was interviewed for this article. Read below to find out about the equipment used on site, how the arches were transported and how many cubic yard of soil had to be transported from the site.



Article: https://www.constructionequipmentguide.com/composite-bridge-system-used-for-first-time-on-west-coast/50134


Recent Posts

See All

AIT's Grist Mill Bridge Featured in ENR

In this article Johanna Knapschaefer, from ENR, highlighted the Grist Mill Bridge project in Hampden, Maine. She talks about the entire scope of the project, along with the advantages of FRP, and the

Ken Sweeny Featured in WABI Story

Watch Ken Sweeny, President and Chief Engineer of AIT Bridges, talk about the Grist Mill project in Hampden, ME and the some of the opportunities for AIT in the near future. https://www.wabi.tv/2021/0